KUNS (Herbertingen)
![](https://kraftwerk-rps.com/wp-content/uploads/2024/07/kuns-solaranlage-herbertingen-referens-kraftwerk-rps-2.png)
DATA LOCATION Herbertingen, GermanyPOWER 1,989 kWpGRID CONNECTION Medium voltageBUILDING Warehouse BUSINESS MODELFull power supplyMODULE Jinko & DMEGCINVENTER H330KTL-H1, SG125HXMOUNTING STRUCTUREYEAR 2024 All references
Ideal Standard (Wittlich)
![](https://kraftwerk-rps.com/wp-content/uploads/2024/07/2173_IDEA_Dach-1030x773.jpg)
DATA LOCATION Wittlich, GermanyPOWER 1.060 kWpGRID CONNECTION Medium voltageBUILDING Solarpark & productionGESCHÄFTSMODELL self-consumptionMODULE JinkoINVENTER HuaweiMOUNTING STRUCTURE PUK Solar, K2 SystemsYEAR 2023 All references
Roof systems
![](https://kraftwerk-rps.com/wp-content/uploads/2023/04/dachanlagenreal.png)
KRAFTWERK identifies the PV potential of your roof areas, which can become a long-term source of income and lead to massive electricity cost/CO2 savings.
Solar park
![](https://kraftwerk-rps.com/wp-content/uploads/2023/04/solarparksr.png)
KRAFTWERK takes care of the planning and approval of ground-mounted solar systems through to turnkey installation. We support you with your project and the lucrative leasing of open spaces.
Storage
![](https://kraftwerk-rps.com/wp-content/uploads/2023/04/batterier.png)
KRAFTWERK provides comprehensive advice on the selection of modern battery storage systems – this integral component of decentralized power supply offers a wide range of profitable applications.
Solar carports
![](https://kraftwerk-rps.com/wp-content/uploads/2023/04/carportsr.png)
The full potential is right on your doorstep. Solar carports on parking and logistics areas also ensure your independence if they supply clean, cost-efficient energy.
Charging infrastructure
![](https://kraftwerk-rps.com/wp-content/uploads/2023/04/ladeinfrarr.png)
KRAFTWERK plans customized solutions for all requirements, coordinates the construction of the charging infrastructure and handles the formalities with your grid operator.
Offgrid
![](https://kraftwerk-rps.com/wp-content/uploads/2023/04/netzferner.png)
From planning to technical implementation, we implement the right PV diesel hybrid system for you.
Arica (Chile)
![](https://kraftwerk-rps.com/wp-content/uploads/2023/04/1862_ENGI_IMG_7960-1030x773.jpg)
Arica, Chile Pilot project DATA LOCATION Arica, ChilePOWER 400 kWpPOWER PLANT TYPE Grid-connectedBUILDING Waste disposal plantYEAR 2020 CONTENT Detailed planning and engineering Construction work, mechanical and electrical work Installation of the single-axis trackers and bifacial modules Construction supervision AC grid-connection Testing and commissioning Alle Referenzen
Lima Abu Al Ragheb
Project Manager
![](https://kraftwerk-rps.com/wp-content/uploads/2023/04/kraftwerk-unternehmen-slider-mitarbeiter-portrait-1-687x1030.jpg)
Every percent of CO2 that we reduce through we reduce through our work
helps to save our planet.